Good morning, Dana
Morning brief
Generated 7:00 AM PTSLA timers
AllLive operations map
Open dispatchLive activity
LiveGPS verified · 2 photos · REQ-1042
BID-2201 drywall · available Nov 30–Jan 15
Roof drain clog · Urgent · AI suggests plumbing
Redding Clinic TI · 6 requirements, 2 risks
Maya Ortiz, Harborline Property Group · Cedar Court Apartments
Maya Ortiz, Harborline Property Group · Harbor Point
Dispatch board
Drag a job onto a crew lane, or take the AI suggestion. Every pick shows why.
Unassigned · 4
AI suggestionsRoof drain clog
Door closer replacement
Suite 4 paint touch-up
Harborline prefers Northshore Paint Co. (sample). This vendor is not yet qualified and cannot be assigned until every required document is complete and staff approve it.
Corridor flooring punch
Harborline prefers Lakeside Flooring Inc. (sample), a customer-invited vendor who has completed qualification.
Live crew map
LiveToday's schedule · Puget Sound
Work orders
| Work order | Customer | Tier | Status | Assigned | SLA |
|---|---|---|---|---|---|
| REQ-1053 Roof drain clog | Harbor Point | Urgent | Timer at risk | Evergreen Restoration | 18 min |
| REQ-1042 Ceiling leak, Unit 3B | Harborline · Cedar Court | Urgent | On site | Bluewater Flooring | On track |
| REQ-1062 No power, suite 210 | Pioneer Lofts | Emergency | Routing | — | 1h target |
| REQ-1051 Lobby LED retrofit | Harborline · Cedar Court | Standard | Bidding | 3 invited | Fri 5 PM |
| REQ-1059 Hallway ceiling | Harborline · Cedar Court | Standard | Scheduled | Bluewater Flooring | Mon 8 AM |
| REQ-1048 Water mitigation, unit 12 | Bayview Commons | Urgent | On site | Evergreen Restoration | On track |
| REQ-1060 Door closer replacement | Cedar Court Bldg A | Standard | New | — | 2 days |
| REQ-1044 Tenant turnover, suite 4 | Rainier Office Park | Standard | Closeout | Summit Interiors | Sign-off |
| REQ-1039 ADA ramp handrail | Lakeside Medical | Standard | Punch | Pacific Openings LLC | 2 items |
Lobby LED retrofit
Hallway ceiling
Triage inbox
AI suggests type, trade and urgency. A person confirms every one.
HVAC not cooling, medical office
Urgent“Exam rooms 3–6 are at 81°F and climbing. Patients are scheduled from 1 PM. Rooftop unit is making a clicking noise.”
Keywords: “not cooling”, “rooftop unit”, occupied clinic → Urgent per response-time tiers (draft).
Routing is rules-based and explainable. A person approves every pick.
Lobby lighting, evening work
StandardPartner with IVO · Bluewater Flooring LLC
Contractor inquiryCeiling leak, drywall & paint
Live timeline
LiveMaya Ortiz sent photos and a $4,800 not-to-exceed.
Dana confirmed drywall & paint, Urgent tier. Rules suggested Bluewater Flooring.
Sam Rivera accepted. Address released after accept.
Ana Kim checked in with GPS and a photo.
Sister a joist. Maya approved in one tap. IVO confirmation waiting.
After the work is done.
Money
Routing
Routing is rules-based and explainable. A person approves every pick.
Photo timeline · 5 photos
Before/after




Punch items
1 of 5 doneCloseout package builder
Pick what goes in. Required items unlock the package.
Package contents

BeforeAfterTick “Customer sign-off” to unlock. Assembling is internal; sending it to Harborline waits for admin approval.
Approvals
One queue for every outgoing action. Approve, edit or reject with a reason.
Waiting · 5
Oldest 2hChange order CO-2 · REQ-1042
Sister a ceiling joist found during demo. +$620. Maya Ortiz approved in the customer app at 11:34 AM.

Sub outreach drafts · BID-2201
Please confirm your price of $94,800 for the four RTU replacements at Cedar Ridge Elementary, that your crew is available Nov 30–Jan 15, and that you can perform the work if IVO is awarded. Reply in the app or this thread.
Checking whether your crew frees up for Cedar Ridge Elementary drywall (18,400 SF, Level 4) between Nov 30 and Jan 15.
Bid submission · BID-2201
AI-filled bid form for Northline Construction (sample GC). Base bid $442,000. Bond 5%. Addenda 1 and 2 acknowledged.
Bid invitations · REQ-1051
Invite Cascade Electric, Pacific Current Electric and Lumen Works Electric (sample) to bid on the lobby LED retrofit. Deadline Fri Nov 20, 5:00 PM PT. Addresses stay hidden until a contractor accepts.
Dispatch draft · REQ-1053
Reassign the roof drain clog to Cascade Electric on-call (11 min away). Evergreen is released.
Routing is rules-based and explainable. A person approves every pick.
Bidding pipeline
Outside contracts from GCs and owners. The AI reads packages, structures scope, levels sub quotes and fills the bid form.
Tacoma Civic Annex HVAC
Portland Fire Station 12
| Bid | Stage | Due | Status | Source |
|---|---|---|---|---|
| BID-2212 Seattle Piers warehouse TI | Found | Due Dec 4 · invitation received | New | Imported from external platform |
| BID-2210 Redding Clinic tenant improvement | Reviewing | Due Nov 25 · AI extracting | In review | Direct invite |
| BID-2198 Bellevue Library lighting | Pricing | Due Nov 21, 3:00 PM PT | 2 days | Direct invite |
| BID-2204 Tacoma Civic Annex HVAC | Sub confirmations | Due Nov 22 · 1 no reply | Waiting | Direct invite |
| BID-2201 Cedar Ridge Elementary modernization | Ready for approval | Due Fri Nov 20, 2:00 PM PT | Ready | Imported from external platform |
| BID-2188 Portland Fire Station 12 | Submitted | Submitted Nov 12 · awaiting award | Out | Direct invite |
| BID-2175 Lynnwood Courthouse doors | Won | Awarded Nov 10 · job opened | Won | Direct invite |
| BID-2162 Boise City Hall roof | Lost | Lost Nov 6 · price | Lost | Direct invite |
| BID-2207 Multnomah Parking garage | No-bid | No-bid Nov 11 · capacity | No-bid | Direct invite |
Package analysis
Cedar Ridge Elementary modernization · Sample School District · Kent, WA · due Fri Nov 20, 2026, 2:00 PM PT
Documents · 4
Source viewer
Click a page reference1.4 Bid submission
Sealed bids are due Friday, November 20, 2026, at 2:00 PM local time. Late bids will not be opened.
Bidders shall acknowledge all addenda on the bid form.
2.2 Bonds and insurance
Each bid shall be accompanied by a bid bond of five percent (5%) of the base bid.
Minimum insurance: general liability $2,000,000, automobile, and workers’ compensation as required by law.
4.1 Time and liquidated damages
Substantial completion within 46 calendar days of notice to proceed. Liquidated damages of $1,500 per calendar day apply thereafter.
Occupied wings
Work in Wings B and C shall be performed at night, 6:00 PM to 4:00 AM, while classes are in session. RTU sets require a crane after hours.
Requirements the AI found
Every line cites its page so you can check the AI. 2 risks raise contingency.
Scope structuring
The AI split the package into trade line items with quantities and sources.
Structured scope
| CSI | Line | Qty | Unit | Source | Trade | Confidence |
|---|---|---|---|---|---|---|
| 09 29 00 | Drywall · Level 4 finish, corridors and classrooms | 18,400 | SF | Specs 09 29 00 · A112 | Drywall | 0.96 |
| 09 65 19 | Flooring · LVP, classrooms 101–118 | 6,200 | SF | Specs 09 65 19 | Flooring | 0.94 |
| 26 51 00 | Electrical · lighting package, rooms 101–118, controls | 1 | LS | Plans E201 | Electrical | 0.81 |
| 23 74 00 | HVAC · four RTU replacements, same size, after-hours set | 4 | EA | Specs 23 74 00 · Add. 2 | HVAC | 0.92 |
| 01 35 00 | Night work premium, Wings B and C | 1 | LS | Add. 2 p. 2 | General | 0.77 |
| 01 74 19 | Construction waste and final clean | 1 | LS | Specs 01 74 19 | General | 0.90 |
Sub outreach & confirmations
The AI matched each trade from the network and drafted a confirmation request.
Drafts waiting · 2
Needs approvalPlease confirm your price of $94,800 for the four RTU replacements at Cedar Ridge Elementary, that your crew is available Nov 30–Jan 15, and that you can perform the work if IVO is awarded. Reply in the app or this thread.
Checking whether your crew frees up for Cedar Ridge Elementary drywall between Nov 30 and Jan 15.
Confirmation progress
Price and dates
+$5,500, controls allowance
Draft follow-up ready
Confirmations
Open leveling| Subcontractor | Trade | Price | Dates | Capacity | Status |
|---|---|---|---|---|---|
| Summit Interiors LLC | Drywall | $72,200 | Nov 30–Jan 15 | Open | Confirmed |
| Bluewater Flooring LLC | Flooring | $86,400 | Nov 30–Jan 15 | Open | Confirmed |
| Cascade Electric | Electrical | $124,000 was $118,500 | Nov 30–Jan 15 | Open | Price changed |
| Harbor Air LLC | HVAC | $94,800 est. | — | — | No reply |
| Metro Drywall Co. | Drywall (alt.) | — | — | Booked | Declined |
Leveling & price
Sub quotes normalized side by side. Exclusions are priced back in so totals compare fairly. You set the final number.
Leveling grid
| Drywall | Summit Interiors LLC | Northshore Walls (sample) | Metro Drywall Co. |
|---|---|---|---|
| Base quote | $72,200 | $79,900 | Declined |
| Level 4 finish, 18,400 SF | Included | Included | — |
| Night work, Wings B & C | Included | Excluded+$6,400 | — |
| Addenda 1 & 2 acknowledged | Included | Included | — |
| Cleanup | Included | Included | — |
| Leveled total | $72,200 | $86,300 | — |
| Flooring | Bluewater Flooring LLC | Ridgeline Floors (sample) | Coastal Surfaces (sample) |
|---|---|---|---|
| Base quote | $86,400 | $81,200 | $92,700 |
| LVP, 6,200 SF | Included | Included | Included |
| Moisture testing | Included | Excluded+$3,900 | Included |
| Furniture moving | Included | Excluded+$2,100 | Excluded+$2,600 |
| Addenda acknowledged | Included | Included | Included |
| Leveled total | $86,400 | $87,200 | $95,300 |
| Electrical | Cascade Electric | Pacific Current Electric (sample) | Lumen Works Electric (sample) |
|---|---|---|---|
| Base quote | $124,000 ↑ | $131,500 | No bid |
| Lighting, rooms 101–118 | Included | Included | — |
| Controls as specified | allowance $6,000 | Included | — |
| Night work | Included | Included | — |
| Addenda acknowledged | Included | Excluded | — |
| Leveled total | $124,000 | $131,500 | — |
| HVAC | Harbor Air LLC | Coldwater Mechanical (sample) | Ridge Air Systems (sample) |
|---|---|---|---|
| Base quote | $94,800 est. | $101,300 | No reply |
| 4 RTUs, same size | Included | Included | — |
| Crane, after hours | Included | Excluded+$4,500 | — |
| Curb adapters | Included | Included | — |
| Addenda acknowledged | unconfirmed | Included | — |
| Leveled total | $94,800 est. | $105,800 | — |
Selected per trade
Recommended price
Confidence 72%HVAC is still an estimate and the electrical price moved. Leveled confirmed quotes + historical RTU unit cost + liquidated-damages risk (ITB p. 11).
Bid form auto-fill
Every field shows where it came from.
Northline Construction bid form (sample)
AI-filledSubmission approval
Approving queues the submission and writes it to the audit log. The prototype does not send it to anyone.
Win → job
Lynnwood Courthouse doors
The won bid became a job automatically, with the confirmed subs already assigned.
Pre-assigned subs
Loss review
Result recorded so the next price recommendation improves.
Boise City Hall roof
What the pricing model learned
Contractor network
Invite-only. Every contractor was vetted and did a watched trial job.
Directory
| Company | Trades | Coverage | Docs | Score | Booked |
|---|---|---|---|---|---|
| Bluewater Flooring LLC | Flooring, drywall | King, Pierce | Current | 4.7 | |
| Evergreen Restoration Co. | Water, rebuild | King, Snohomish | Current | 4.8 | |
| Cascade Electric | Electrical, on-call plumbing | King, Multnomah | COI in 21 days | 4.5 | |
| Summit Interiors LLC | Drywall, framing | Pierce, Thurston | Current | 4.6 | |
| Pacific Openings LLC | Doors, hardware | Snohomish | Current | 4.4 | |
| Harbor Air LLC | HVAC | Pierce, King | W-9 missing | 4.6 |
Bluewater Flooring LLC
Why the router picks them
Routing is rules-based and explainable. A person approves every pick.
Compliance
Invited vendors
Every vendor any customer has invited. Search and filter by customer, status and trade.
Approval queue · 3
Docs required before approvalNorthshore Paint Co. (sample)
Docs: Not started
Pinnacle Glass LLC (sample)
Docs: 3 of 8 complete
Ridgeway Mechanical (sample)
Docs: 7 of 8 complete · awaiting staff approval
All invited vendors
Every customer invite · sample data| Vendor | Trade | Invited by | Property | Invite date | Status | Docs | Preferred | Qualification |
|---|---|---|---|---|---|---|---|---|
| Northshore Paint Co. (sample) Elena Vasquez | Paint | Harborline Property Group Maya Ortiz | Cedar Court Apartments | Nov 14, 2026 | Invited | Not started | Preferred | Not yet qualified |
| Pinnacle Glass LLC (sample) Omar Haddad | Glazing | Harborline Property Group Maya Ortiz | Harbor Point | Nov 12, 2026 | Applying | 3 of 8 complete | — | Not yet qualified |
| Ridgeway Mechanical (sample) Chris Nguyen | HVAC | Bayview Commons (sample) Priya Shah | Bayview Commons | Nov 10, 2026 | Under review | 7 of 8 complete · awaiting staff approval | Preferred | Not yet qualified |
| Lakeside Flooring Inc. (sample) Mei Chen | Flooring | Harborline Property Group Jordan Lee | Cedar Court Apartments | Oct 28, 2026 | Approved | Current | Preferred | Qualified |
| Harbor Hardware Co. (sample) Luis Ortega | Doors & hardware | Pioneer Lofts (sample) Ken Walsh | Pioneer Lofts | Nov 3, 2026 | Not approved | Incomplete | — | Not yet qualified |
| Clearview Maintenance (sample) Dana Brooks | General repair | Lakeside Medical (sample) Avery Cole | Lakeside Medical | Sep 18, 2026 | Approved | Expired · assignment suspended | — | Assignment suspended |
| Willamette Electric (sample) Jordan Blake | Electrical | Rainier Office Park (sample) Sam Park | Rainier Office Park | Aug 2, 2026 | Approved | GL expires in 12 days · reminder drafted | Preferred | Qualified |
7 vendors
Ridgeway Mechanical (sample)
Qualification checklist
7 of 8 completeApprove is available only when every required document is on file. Preview only — nothing is sent.
Invitation
Assignment rule
This vendor is Not yet qualified and cannot be assigned to any job. The customer can see that status but cannot override it.
Contractor vetting
Northwest Glazing (sample)
Bluewater Flooring LLC
Ridgeline Floors (sample)
Lumen Works Electric (sample)
Coldwater Mechanical (sample)
Summit Interiors LLC
Integrations
Connect outside tools for bidding and the rest of the work. Each real hookup needs your approval and that platform's API access.
Bid platforms and plan rooms
Pull invitations, plans and addenda from outside bidding platforms and plan rooms. Each real connection needs your approval and that platform's API access.
Email import of bid invites
A watched intake mailbox turns a forwarded invitation into a bid in Found, with attachments saved to the package.
Calendar
Push bid due dates and job windows to the staff calendar, and show sub availability you already confirmed.
Accounting
Send awarded job costs and, later, invoices. No payments are processed at launch.
File storage
Private storage for plans, specs and filled forms, with virus scanning and signed links.
Webhooks and API keys
Let approved systems create bids, post sub responses and receive status changes. Keys are scoped and can be revoked.
Event log · sample
Settings
Who can do what, and what needs approval.
Role matrix
Open decision: second admin| Role | Approve routing | Approve CO | Submit bids | Sees |
|---|---|---|---|---|
| Owner admin | Yes | Yes | Yes | Everything |
| Staff | Draft | Draft | Draft | Assigned work |
| Customer | — | Own CO only | — | Own company |
| Contractor | — | — | Own bids | Own jobs |
Audit log
Who did what, when, including every AI draft and every approval.
Events
| Time | Actor | Action | Object | Hash | Prev hash |
|---|---|---|---|---|---|
| 9:02:10 AM | Ana Kim contractor | checked in | REQ-1042 | a41f…9c02 | 7be1…41aa |
| 8:51:22 AM | System integration | recorded sub response | BID-2201 · Summit | 7be1…41aa | f03c…22d9 |
| 8:44:05 AM | Dana Whitfield staff | confirmed triage | Inquiry · Tacoma HVAC | f03c…22d9 | 19d0…b7e4 |
| 8:40:31 AM | Copilot AI | drafted 2 sub messages | BID-2201 | 19d0…b7e4 | c6a2…0e15 |
| 8:12:44 AM | System AI | analyzed package | BID-2210 · 6 requirements | c6a2…0e15 | 5e88…aa31 |
| Fri 6:10 PM | Val owner admin | approved change order | CO-1 · REQ-1042 | 5e88…aa31 | 90b4…7c6f |
| Fri 4:02 PM | Maya Ortiz customer | approved change order | CO-2 · REQ-1042 | 90b4…7c6f | 2d17…e820 |