PrototypeV03 · fictional sample data · nothing is sent or saved All apps

Sign in

Check your email

Code sent to sam@bluewater.example

Sign-in code

After you join, your first job is a closely watched trial.

Tue Nov 17 · Bluewater FlooringToday

Now · job 1 of 2On site 1h 12m

Ceiling leak, drywall & paint

REQ-1042 · Cedar Court Apartments, Unit 3B · 410 Sample Ave, Tacoma

Window
9:00 AM – 3:00 PM
Approved (NTE)
$4,800
GPS check-in + photo
Before photos (3)
CO-2 · +$620 · approved by customer
Close ceiling, texture, paint
After photos + punch

Next

REQ-1059 · Hallway ceiling
Mon 8:00 AM · Cedar Court Bldg B · 6 min drive
IVO asks you to confirm a bid price
BID-2201 · flooring $86,400

Projects

Direct offer

Hallway ceiling repair

Tacoma (Pierce) · drywall & paint · NTE $2,500
3 files2 photosAddress after accept
Open for bids5d

Lobby LED retrofit

Tacoma · electrical · 3 contractors invited
Hallway ceiling · $2,350
Submitted · IVO compares bids
Sent
Door closer · $260
Won · Oct 4
Won
Gutter cleaning · $1,100
Not selected
Closed

Packet

Hallway ceiling repair

REQ-1059 · Cedar Court Bldg B · exact address after you accept

CUSTOMERHallway stain (sample photo)
Hallway stainNov 15
Scope
Patch ~4 sq ft, texture, paint to match
3 files
Floor plan, photos, paint spec
Respond by
Fri Nov 20, 5:00 PM PT
Bid

Submit a bid

NTE is $2,500. You’re $150 under.

Amount
$2,350
Start
Mon Nov 23
Notes
Paint to match, no wallpaper

Sent

Bid submitted

IVO compares bids and approves any award before you hear back.

Back to projects

Bid confirmation

BID-2201 · IVO is bidding as a subNeeds a reply

Cedar Ridge Elementary modernization

Flooring · LVP, 6,200 SF. IVO needs you to confirm price, dates and capacity in case IVO is awarded the work.

Your price
$86,400
Dates
Nov 30, 2026 – Jan 15, 2027
Capacity
Can you perform the work if IVO wins?

Your reply goes only to IVO. IVO’s messages to you are always approved by an IVO admin first.

Schedule

REQ-1042

Ceiling leak, drywall & paint

Cedar Court Apartments, Unit 3B · 410 Sample Ave, Tacoma WA

Approved (NTE)
$4,800
Your quote
$4,350
CO-2 +$620 approved
Request receivedMon 8:12 AM

Maya Ortiz sent photos and a $4,800 not-to-exceed.

IVO reviewedMon 8:40 AM

Dana confirmed drywall & paint, Urgent tier. Rules suggested Bluewater Flooring.

Contractor acceptedMon 1:05 PM

Sam Rivera accepted. Address released after accept.

On siteTue 9:02 AM

Ana Kim checked in with GPS and a photo.

Change order CO-2 · +$620Tue 11:20 AM

Sister a joist. Maya approved in one tap. IVO confirmation waiting.

Punch, sign-off and closeout packageNext

After the work is done.

Camera check-in

Check in

Works offline
Camera viewfinder (sample photo)
47.2529 N, 122.4443 W · ±6 m · 9:02 AM PT
Inside the Cedar Court geofence

Punch on plan

Sheet A-201 · Unit 3B. Tap a pin or an item. Closing an item asks for a photo.

Punch items

1 of 5 done
#1
Close ceiling opening
Hallway · 4 sq ft
Closed
#2
Texture to match
Hallway ceiling
Open
#3
Final paint after dry
Unit 3B living room
Open
#4
Replace stained base trim
Bedroom 2
Open
#5
Check smoke detector reinstalled
Kitchen
Open

Photos

Tue Nov 17
CHECK-INArrival · GPS (sample photo)
Arrival · GPS9:02
BEFORECeiling opened (sample photo)
Ceiling opened9:40
CO-2Joist damage (sample photo)
Joist damage11:20
Mon Nov 16
SURVEYBuilding exterior (sample photo)
Building exterior1:05
SURVEYUnit 3B hallway (sample photo)
Unit 3B hallway1:12

Change order

EVIDENCEJoist damage (sample photo)
Joist damage11:20

Don’t start extra work until the customer and IVO approve.

Closeout

0%

Ready to close?

Documents

Certificate of insurance
GL $2M · expires Apr 2, 2027
Current
W-9
On file
On file
WA registration
Active · checked weekly
Active
Auto insurance
Expires in 21 days
IVO only routes work when required documents are current.

Joining IVO

You're in

Bluewater Flooring is on the network.

Invite-only after vetting. Your first job was a closely watched trial — and you passed.

Invited by IVO
After staff vetting · Oct 2
Company info
Bluewater Flooring LLC
Trades & regions
Flooring, drywall · King, Pierce
Documents
COI, W-9, registration
References
Count still open: 1 or 2
Watched trial first job
REQ-0988 · passed Oct 20
Ready for routing
Since Oct 21
See the new join flow
Option A, approved by the owner 2026-11-13: invite-only after vetting, with a closely watched trial first job.

Company & crew

BF
Bluewater Flooring LLC
Sam Rivera · King, Pierce · flooring & drywall

Crew

Ana Kim
Field lead
Ben Okafor
Field

Earnings glance

Tracking only
$6,430

This month. Payouts are Later, not in the launch build.

Joining record
Option A · watched trial passed
Open
Sheet A-201
REQ-1042 · Unit 3B · Version 1 · Ana Kim
4 marks on this pageOriginal plan never changes

Versions

BEDROOM 2 KITCHEN BATH BEDROOM 1 LIVING / HALL A-201 · UNIT 3B · SAMPLE 1/4" = 1'-0"

Saving the markup adds a punch item when you drop a pin.

Saved versions

Voice notes

Voice notes

2

Up to 3 minutes. If the microphone isn't allowed, this preview saves a sample note instead. A transcript is written in the language you speak; IVO staff can read a translation.

Recording 0:00 / 3:00
  • Ana KimPunch item 3ExampleToday 11:18 AM · 0:18

    Hay una grieta en la viga sobre la abertura. Hay que hermanar con un 2x8 de 6 pies.

    Translated to English There's a crack in the joist above the opening. Sister it with a 2x8, 6 feet.

    Sample transcript, labeled as an example. Customers never see voice notes.

  • Sam RiveraExampleToday 9:40 AM · 0:09

    Checked the paint match in 3B. Close enough to proceed.

    Sample transcript, labeled as an example.

esc
↑ ↓ move↵ openesc closeActions that send anything open a draft for approval

Keyboard shortcuts

⌘K
Command menu (also /)
G then a letter
Go to a screen (letters shown in the sidebar)
J K
Move through a list, ↵ to open
.
Open or close the copilot
?
This sheet
esc
Close menus and sheets